| Operational Costs for Denver Skatepark |
|
|
|
|
|
|
|
|
|
| Source:
Tiffiany Moehring, PR" <tiffiany.moehring@ci.denver.co.us> |
|
|
|
|
| |
|
|
|
|
| MAINTENANCE |
TASKS |
TIME MEASURE COST |
INVENTORY MEASURE |
TOTAL TASK COST |
FREQUENCY |
FREQUENCY X TASK COST |
EMPLOYEE |
EQUIPMENT |
TIME |
MEASURE |
| SIDEWALKS |
Sweep/Blow/Wash |
$6.72 |
100 |
$0.67 |
297 |
$199.58 |
Utility Worker |
pickup, power washer, broom, blower |
30 min |
1000 |
| SIDEWALKS |
Salt/Sand |
$6.72 |
100 |
$0.67 |
12 |
$8.06 |
Utility
Worker |
pickup, hand tools,
salt or sand |
30 min |
1000 |
| SIDEWALKS |
Machine
Snow/ice/Removal |
$0.73 |
100 |
$0.07 |
18 |
$1.32 |
Sr.
Utility Worker |
truck with plow |
3 min |
1000 |
| SIDEWALKS |
Manual Snow/ice/
Removal |
$3.36 |
100 |
$3.36 |
18 |
$60.48 |
Utility
Worker |
shovel, snow blower,
ice melt |
15 min |
100 |
| SIDEWALKS |
Edging |
$6.72 |
100 |
$6.72 |
15 |
$100.80
|
(2)
Utility Workers |
edger/power, shovels,
rakes, brooms |
15 min |
100 |
| SIDEWALKS |
Weed Spraying/Removal |
$3.67 |
100 |
$3.67 |
2 |
$7.35 |
Sr.
Utility Worker |
chemicals, truck,
spray eqpt. |
15 min |
100 |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| SIGNS /
BOLLARDS |
Repair |
$2.24 |
3 |
$6.72 |
6 |
$40.32 |
Utility
Worker |
truck, tools,
materials |
10 min |
unit |
| SIGNS /
BOLLARDS |
Replace / Install |
$26.88 |
3 |
$80.64 |
3 |
$241.92
|
(2)
Utility Workers |
truck, tools,
materials |
1 hr |
unit |
| SIGNS /
BOLLARDS |
Bulletin Boards
Repair |
$16.06 |
0 |
$
- |
0 |
$
- |
Maintenance
Tech |
truck, tools,
materials |
1 hr |
unit |
| SIGNS (ID) |
Grafitti
removal/paint |
$2.24 |
3 |
$6.72 |
116 |
$779.52
|
Utility
Worker |
truck, tools,
materials |
10 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| TRAILS/PATHS |
Sweep/Blow/Wash |
$6.72 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
pickup, power washer,
broom, blower |
30 min |
1000 |
| TRAILS/PATHS |
Salt/Sand |
$6.72 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
pickup, hand tools,
salt or sand |
30 min |
1000 |
| TRAILS/PATHS |
Machine Snow/Ice
Removal |
$0.73 |
0 |
$
- |
0 |
$
- |
Sr.
Utility Worker |
truck with plow |
3 min |
1000 |
| TRAILS/PATHS |
Manual Snow/Ice
Removal |
$3.36 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
shovel, snow blower,
ice melt |
15 min |
1000 |
| TRAILS/PATHS |
Edging |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Worker |
edger/power, hand
tools, broom |
15 min |
1000 |
| TRAILS/PATHS |
Weed Spraying |
$3.67 |
0 |
$
- |
0 |
$
- |
Sr.
Utility Worker |
chemicals, truck,
spray equipment |
15 min |
100 |
| TRAILS/PATHS |
Crusher Fine Repair |
$14.40 |
0 |
$
- |
0 |
$
- |
Equipment
Operater, Utility Worker |
truck, tamper, hand
tools, materials |
30 min |
100 |
| TRAILS/PATHS |
Asphalt patching |
$2.34 |
0 |
$
- |
0 |
$
- |
(1)
Sr. Utility Worker (1) Utility Worker |
truck, hand tools,
materials |
5 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| ROADWAYS |
Sweep |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
pickup, hand tools |
15 min |
100 |
| ROADWAYS |
Salt/Sand |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
pickup, hand tools,
materials |
15 min |
100 |
| ROADWAYS |
Machine Snow/ice
Removal |
$3.84 |
0 |
$
- |
0 |
$
- |
Equipment
Operater |
truck/plow |
15 min |
1000 |
| ROADWAYS |
Edging (curb) |
$4.34 |
0 |
$
- |
0 |
$
- |
(2)
Equipment Operaters (2) Utility Workers |
tractor/disc, dump truck,
pickup, tools |
5 min |
100 |
| ROADWAYS |
Weed Spraying/Removal |
$1.41 |
0 |
$
- |
0 |
$
- |
(1)
Sr Utility Worker (1)
Utility Worker |
pickup/sprayer,
chemical |
3 min |
100 |
| ROADWAYS |
Asphalt Patching |
$2.34 |
0 |
$
- |
0 |
$
- |
(1)
Sr Utility Worker (1)
Utility Worker |
truck, hand tools,
materials |
5 min |
unit |
| ROADWAYS |
Clean Drains/inlets |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
pickup, hand tools |
15 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| FLOWER BEDS |
Design/plants
Selection |
$8.03 |
0 |
$
- |
0 |
$
- |
Horticulturist |
plans, office
supplies |
30 min |
1000 |
| FLOWER BEDS |
Soil Amendments |
$52.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
hand tools, mulch,
compost, stake truck |
2 hr |
1000 |
| FLOWER BEDS |
Rototill |
$26.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
truck, tiller, hand
tools |
1 hr |
1000 |
| FLOWER BEDS |
Fertilize |
$4.02 |
0 |
$
- |
0 |
$
- |
Horticulturist |
truck, chemical, hand
tools |
5 min |
1000 |
| FLOWER BEDS |
Planting |
$104.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
truck, flowers, hand
tools |
4 hr |
1000 |
| FLOWER BEDS |
Edging |
$26.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
truck, edger, hand
tools |
1 hr |
1000 |
| FLOWER BEDS |
Pest Control |
$4.02 |
0 |
$
- |
0 |
$
- |
Horticulturist |
truck, sprayer,
chemical |
15 min |
1000 |
| FLOWER BEDS |
Weed Spray/Removal |
$6.50 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
truck, sprayer,
chemical, hand tools |
15 min |
1000 |
| FLOWER BEDS |
Deadheading |
$208.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
hand tools |
8 hr |
1000 |
| FLOWER BEDS |
Manual irrigation |
$4.97 |
0 |
$
- |
0 |
$
- |
Seasonal |
quick couplers, hose |
30 min |
1000 |
| FLOWER BEDS |
Public Relations |
$4.02 |
0 |
$
- |
0 |
$
- |
Horticulturist |
|
15 min |
incident |
| FLOWER BEDS |
Mulching |
$52.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
stake truck, mulch,
hand tools |
2 hr |
1000 |
| |
|
|
|
|
|
|
|
|
|
|
| SHRUBS |
Plant Replacement |
$104.00 |
0 |
$
- |
0 |
$
- |
Horticulturist/
Seasonal |
truck, plants, hand
tools |
4 hr |
1000 |
| SHRUBS |
Mulching |
$52.00 |
1000 |
$52.00 |
3 |
$156.00 |
Horticulturist/
Seasonal |
stake truck, hand
tools, mulch |
2 hr |
1000 |
| SHRUBS |
Weed Spray/Removal |
$12.32 |
1000 |
$12.32 |
2 |
$24.63 |
Sr
Utility Worker/ Seasonal |
truck, sprayer,
chemicals |
30 min |
1000 |
| SHRUBS |
Edging |
$24.63 |
0 |
$
- |
0 |
$
- |
Sr
Utility Worker/ Seasonal |
truck, hand tools |
1 hr |
1000 |
| SHRUBS |
Pruning |
$118.00 |
0 |
$
- |
0 |
$
- |
(1)
Horticulturist
(1) Utility Worker |
truck, hand tools |
4 hr |
1000 |
| |
|
|
|
|
|
|
|
|
|
|
| IRRIGATION |
Activate |
$59.00 |
1 |
$11.80 |
1 |
$11.80 |
(1)
Maintenance Tech (1) Utility
Worker |
utility truck, hand
tools |
2 hr |
5 acres |
| IRRIGATION |
Inspections |
$29.50 |
1 |
$29.50 |
251 |
$7,404.50
|
(1)
Maintenance Tech (1) Utility
Worker |
utility truck, hand
tools |
1 hr |
site |
| IRRIGATION |
Repair/Replacements |
$59.00 |
1 |
$59.00 |
56 |
$3,304.00
|
(1)
Maintenance Tech (1) Utility
Worker |
utility truck, hand
tools |
2 hr |
site |
| IRRIGATION |
Clock Operations |
$8.03 |
1 |
$8.03 |
108 |
$867.24
|
Maintenance
tech |
truck |
30 min |
site |
| IRRIGATION |
Stock
Supplies/inventory |
$8.03 |
1 |
$8.03 |
5 |
$40.15 |
Maintenance
tech |
truck, materials |
30 min |
site |
| IRRIGATION |
Installations/Revamp |
$236.00 |
1 |
$236.00 |
4 |
$944.00 |
(1)
Maintenance Tech (1) Utility
Worker |
truck, materials,
hand tools |
8 hr |
site |
| IRRIGATION |
Winterize |
$64.24 |
0 |
$
- |
0 |
$
- |
Maintenance
tech |
utility truck, hand
tools |
4 hr |
5 acres |
| IRRIGATION |
Pump system
maintenance |
$16.06 |
0 |
$
- |
0 |
$
- |
Maintenance
tech |
utility truck, hand
tools |
1 hr |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| PICNIC SITES |
Sweep/Blow/Wash |
$26.88 |
1 |
$26.88 |
216 |
$5,806.08
|
Utility
Worker |
hand tools, truck,
hose, soap |
2 hr |
site |
| PICNIC SITES |
Painting (tables) |
$13.44 |
5 |
$67.20 |
3 |
$201.60
|
(2)
Utility Workers |
paint, truck, hand
tools |
30 min |
unit |
| PICNIC SITES |
Graffiti Removal |
$26.88 |
1 |
$26.88 |
62 |
$1,666.56
|
Utility
Worker |
truck, paint, sand
blaster |
2 hr |
site |
| PICNIC SITES |
Inspections |
$4.02 |
1 |
$4.02 |
318 |
$1,276.77
|
Maintenance
Tech |
truck, hand tools |
15 min |
site |
| PICNIC SITES |
Repairs/Replacements |
$59.00 |
0 |
$
- |
0 |
$
- |
(1)
Maintenance Tech (1) Utility
Worker |
truck, hand tools |
2 hr |
site |
| PICNIC SITES |
Manage Permits |
$2.24 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
|
10 min |
site |
| PICNIC SITES |
Trash Removal |
$4.97 |
1 |
$4.97 |
327 |
$1,625.19
|
(2)
Seasonals |
truck, hand tools |
15 min |
site |
| PICNIC SITES |
Post
bulletins/permits |
$2.24 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck |
10 min |
site |
| |
|
|
|
|
|
|
|
|
|
|
| PARKING LOTS |
Sweep |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
truck, hand tools |
15 min/sq ft |
100 |
| PARKING LOTS |
Salt/sand |
$6.72 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
truck, materials,
hand tools |
15 min |
site |
| PARKING LOTS |
Machine Snow/ice
Removal |
$3.84 |
0 |
$
- |
0 |
$
- |
Equipment
Operater |
truck,plow |
15 min |
site |
| PARKING LOTS |
Weed Spraying/Removal |
$3.67 |
0 |
$
- |
0 |
$
- |
Sr
Utility Worker |
truck,sprayer,chemicals |
15 min |
site |
| PARKING LOTS |
Asphalt Patching |
$2.34 |
0 |
$
- |
0 |
$
- |
(1)
Sr Utility Worker (1)
Utility Worker |
truck,hand
tools,materials |
5 min |
unit |
| PARKING LOTS |
Curb stops
Replacement |
$7.03 |
0 |
$
- |
0 |
$
- |
(1)
Sr Utility Worker (1)
Utility Worker |
truck,materials,hand
tools |
15 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| TOILETS PERM |
Inspections |
$3.36 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck |
15 min |
site |
| TOILETS PERM |
Graffiti Removal |
$107.52
|
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, chemical,
paint, sand blaster/washer |
8 hr |
unit |
| TOILETS PERM |
Sweep/Wash W/Hose |
$26.88 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
hand tools, hose,
soap, truck |
2 hr |
site |
| TOILETS PERM |
Power wash |
$26.88 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
pressure washer,
truck, chemicals |
2 hr |
site |
| TOILETS PERM |
Repairs |
$16.06 |
0 |
$
- |
0 |
$
- |
Maintenance
Tech |
truck, hand tools,
matericals |
1 hr |
site |
| TOILETS PERM |
Restock supplies |
$2.24 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, materials |
10 min |
site |
| TOILETS PERM |
Activate/winterize |
$8.03 |
0 |
$
- |
0 |
$
- |
Maintenance
Tech |
trucks, hand tools |
30 min |
site |
| |
|
|
|
|
|
|
|
|
|
|
| TOILETS
PORTABLE & ENCLOSURES |
Inspections |
$0.45 |
2 |
$0.90 |
280 |
$250.88
|
Utility
Worker |
truck |
2 min |
unit |
| TOILETS
PORTABLE & ENCLOSURES |
Enclosure Trash
Removal |
$1.12 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, hand tools,
broom |
5 min |
unit |
| TOILETS
PORTABLE & ENCLOSURES |
Enclosure Grafitti
Removal |
$3.36 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, chemicals,
paint |
15 min |
unit |
| TOILETS
PORTABLE & ENCLOSURES |
Enclosure Power Wash |
$6.72 |
1 |
$6.72 |
11 |
$73.92 |
Utility
Worker |
truck, pressure
washer, soap |
30 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| TREES |
Planting |
$26.88 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
hand tools, pickup |
1 hr |
tree |
| TREES |
Pruning/Trimming |
$2.68 |
10 |
$26.77 |
3 |
$80.30 |
Horticulturist |
tools, pickup |
10 min |
tree |
| TREES |
Manual irrigating |
$2.56 |
39 |
$99.84 |
1 |
$99.84 |
Equipment
Operater |
water truck |
10 min |
tree |
| TREES |
Removals |
$13.44 |
7 |
$94.08 |
1 |
$94.08 |
(2)
Utility Workers |
truck, tools, soil |
30 min |
tree |
| TREES |
Mulching |
$1.12 |
39 |
$43.68 |
7 |
$305.76
|
Utility
Worker |
truck, mulch |
5 min |
tree |
| TREES |
Weed control
(roundup) |
$1.22 |
10 |
$12.24 |
3 |
$36.73 |
Sr
Utility Worker |
truck, sprayer,
chemical |
5 min |
tree |
| |
|
|
|
|
|
|
|
|
|
|
| FIELDS |
Fence repairs |
$14.75 |
0 |
|
|
|
(1)
Maintenance Tech (1)
Utility Worker |
truck, materials,
hand tools |
30 min |
unit |
| FIELDS |
Seeding/resodding |
$161.28
|
0 |
$
- |
0 |
$
- |
(3)
Utility Workers |
truck, sod cutter,
sod/seed, hand tools |
4 hr |
field |
| FIELDS |
Bleacher/repair/replace |
$59.00 |
0 |
$
- |
0 |
|
(1)
Maintenance Tech (1)
Utility Worker |
truck, hand tools,
materials |
2 hr |
site |
| FIELDS |
Fertilize |
$5.01 |
0 |
$
- |
0 |
|
(1)
Equipment Operater (1) Sr
Utility Worker |
tractor, spreader,
truck |
10 min |
acre |
| FIELDS |
Aerate |
$7.20 |
0 |
$
- |
0 |
|
(1)
Equipment Operater (1) Utility
Worker |
tractor, attachment |
15 min |
acre |
| |
|
|
|
|
|
|
|
|
|
|
| COURTS |
Prepare horseshoe
pits |
$26.88 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
truck |
1 hr |
court |
| COURTS |
Repair/replace nets |
$2.24 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, hand tools,
materials |
10 min |
net |
| COURTS |
Sweep/blow/wash |
$26.88 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
blower, hand tools,
truck, hose |
2 hr |
site |
| COURTS |
Fence repair |
$14.75 |
0 |
$
- |
0 |
$
- |
(1)
Maintenance Tech (1)
Utility Worker |
truck, materials,
hand tools |
30 min |
unit |
| COURTS |
Prepare volleyball
sand |
$281.92
|
0 |
$
- |
0 |
$
- |
(1)
Equipment Operater (2)
Seasonals |
tractor |
8 hr |
site |
| COURTS |
Inspections |
$10.97 |
0 |
$
- |
0 |
$
- |
Supervisor |
truck |
30 min |
site |
| COURTS |
Graffiti removal |
$26.88 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, materials,
hand tools |
2 hr |
site |
| COURTS |
Bench/table repair |
$59.00 |
0 |
$
- |
0 |
$
- |
(1)
Maintenance Tech (1) Utility
Worker |
truck, hand tools,
materials |
2 hr |
site |
| COURTS |
Maintain fitness
courses |
$107.52
|
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
truck, hand tools,
materials |
4 hr |
site |
| |
|
|
|
|
|
|
|
|
|
|
| PLAZA |
Sweep/blow/wash |
$161.28
|
1 |
$161.28
|
237 |
$38,223.36 |
(2)
Utility Workers |
truck, hand tools |
6 hr |
site |
| PLAZA |
Salt/sand (Steps) |
$3.36 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, hand tools, materials |
15 min |
site |
| PLAZA |
Manual snow/ice
removal |
$215.04
|
1 |
$215.04
|
3 |
$645.12
|
(4)
Utility Workers |
hand tools |
4 hr |
site |
| PLAZA |
Edging |
$5.85 |
0 |
$
- |
0 |
$
- |
(1)
Utility Worker
(1) Seasonal |
edger/power, hand
tools |
15 min |
100 |
| PLAZA |
Weed spraying/removal |
$3.67 |
0 |
$
- |
0 |
$
- |
Sr
Utility Worker |
truck, sprayer,
chemicals |
15 min |
site |
| |
|
|
|
|
|
|
|
|
|
|
| LAKES |
Docks, piers, ramps
repair |
$236.00 |
0 |
$
- |
0 |
$
- |
(1)
Maintenance Tech (1) Utility
Worker |
truck, hand tools,
materials |
8 hr |
site |
| LAKES |
Aquatic weed control |
$152.28
|
0 |
$
- |
0 |
$
- |
(1)
Sr Utility Worker (1)
Utility Worker
(1) Seasonal |
truck, boat, sprayer,
chemicals |
4 hr |
site |
| LAKES |
Lakeshore cleanup |
$173.04
|
0 |
$
- |
0 |
$
- |
(1)
Utility Worker
(3) Seasonals |
truck, hand tools |
4 hr |
site |
| LAKES |
Erosion control |
$778.88
|
0 |
$
- |
0 |
$
- |
(1)
Equipment Operater (1)
Utility Worker
(2) Seasonals |
truck,
tractor/attachments, soil |
16 hr |
site |
| LAKES |
Mowing/trimming |
$238.56
|
0 |
$
- |
0 |
$
- |
(3)
Seasonals |
rotory mowers, string
trimmers |
8 hr |
site |
| LAKES |
Clean
overflows/inlets |
$13.44 |
0 |
$
- |
0 |
$
- |
(2)
Utility Workers |
truck, hand tools |
30 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| TRASH |
Hauling/Empty
Dumpsters |
$2.40 |
0 |
$
- |
0 |
$
- |
(1)
Equipment Operater (1)
Utility Worker |
truck |
5 min |
unit |
| TRASH |
Empty 55-gal barrels |
$1.95 |
9 |
$17.54 |
177 |
$3,103.70
|
(1)
Utility Worker
(1) Seasonal |
truck, bags |
5 min |
unit |
| TRASH |
Brush/debris removal |
$2.40 |
1 |
$2.40 |
10 |
$24.00 |
(1)
Equipment Operater (1) Utility
Worker |
truck, hand tools |
5 min |
unit |
| |
|
|
|
|
|
|
|
|
|
|
| MONUMENTS |
Inspections |
$4.02 |
0 |
$
- |
0 |
$
- |
Maintenance
Tech |
truck |
15 min |
site |
| MONUMENTS |
Graffiti removal |
$29.38 |
0 |
$
- |
0 |
$
- |
Sr
Utility Worker |
chemicals, sand
blaster, truck |
2 hr |
site |
| |
|
|
|
|
|
|
|
|
|
|
| PLAYGROUNDS |
Sand sweeping |
$6.72 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
broom, blower, truck |
30 min |
site |
| PLAYGROUNDS |
Inspections/inventory |
$8.03 |
0 |
$
- |
0 |
$
- |
Maintenance
Tech |
truck |
30 min |
site |
| PLAYGROUNDS |
Rototill |
$23.38 |
0 |
$
- |
0 |
$
- |
(1)
Utility Worker
(1) Seasonal |
tiller, tools, truck |
1 hr |
site |
| PLAYGROUNDS |
Surface materials |
$23.38 |
0 |
$
- |
0 |
$
- |
(1) Utility
Worker (1)
Seasonal |
tools, truck,
materials |
1 hr |
site |
| PLAYGROUNDS |
Weed control |
$6.72 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, tools |
30 min |
site |
| PLAYGROUNDS |
Graffiti removal |
$26.88 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, chemical,
paint, sand blaster |
2 hr |
site |
| PLAYGROUNDS |
Equipment
replace/repair |
$3.36 |
0 |
$
- |
0 |
$
- |
Utility
Worker |
truck, materials |
15 min |
site |
| PLAYGROUNDS |
Painting |
$187.04
|
0 |
$
- |
0 |
$
- |
(1) Utility
Worker (1)
Seasonal |
truck, paint |
8 hr |
site |
| |
|
|
|
|
|
|
|
|
|
|
| TURF |
Mowing |
$3.84 |
0 |
$
- |
0 |
$
- |
Equipment Operater |
15' mower |
15 min |
acre |
| TURF |
Mowing |
$3.67 |
0.25 |
$0.92 |
19 |
$17.44 |
Sr
Utility Worker |
72" mower |
15 min |
acre |
| TURF |
Fertilize |
$5.01 |
0 |
$
- |
0 |
$
- |
(1)
Equipment Operater (1) Sr
Utility Worker |
tractor, spreader, truck |
10 min |
acre |
| TURF |
Aerate |
$3.84 |
0.25 |
$0.96 |
1 |
$0.96 |
Equipment
Operater |
tractor |
15 min |
acre |
| TURF |
Trimming |
$4.97 |
0.25 |
$1.24 |
20 |
$24.85 |
(2)
Seasonals |
hand mower, string
trimmer, truck |
15 min |
acre |
| TURF |
Seeding/resodding |
$99.96 |
10000 |
$9,996.00
|
1 |
$9,996.00
|
(1)
Utility Worker
(2) Seasonals |
sod cutter, truck,
sod, tools |
3 hr/sq ft |
100 |
| TURF |
Irrigating (manual) |
$3.31 |
1 |
$3.31 |
34 |
$112.65
|
Seasonal |
small vehicle,
sprinklers |
20 min |
acre |
| TURF |
Weed control |
$0.25 |
1 |
$0.25 |
2 |
$0.50 |
Sr
Utility Worker |
truck with
tank&boom |
20 min |
acre |
| TURF |
Raking/litter lifting |
$15.03 |
0.25 |
$3.76 |
50 |
$187.81
|
(1)
Equipment Operater (1) Sr
Utility Worker |
tractor, litter lift,
dump truck, hand tools |
30 min |
acre |
| TURF |
Trash removal |
$1.66 |
1.5 |
$2.49 |
308 |
$765.38
|
(2)
Seasonals |
truck, hand tools |
5 min |
acre |
| TURF |
Power mulching |
$3.67 |
0 |
$
- |
0 |
$
- |
Sr
Utility Worker |
72
" mower |
15 min |
acre |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| EVENTS |
Meetings/coordination/
Manage permits |
$87.72 |
1 |
$87.72 |
4 |
$350.88
|
Supervisor |
truck |
4 hr |
event |
| EVENTS |
Inspections |
$219.30
|
1 |
$219.30
|
4 |
$877.20
|
Supervisor |
truck |
10 hr |
event |
| EVENTS |
Clean up |
$39.76 |
4 |
$159.04
|
3 |
$477.12
|
(2)
Seasonals |
hand tools |
2 hr |
event |
| EVENTS |
Public relations |
$120.96
|
0 |
$
- |
0 |
$
- |
(3)
Utility Workers |
|
3 hr |
event/day |
| EVENTS |
Repair/replace |
$1,353.12
|
0 |
$
- |
0 |
$
- |
(1)
Maintenance Tech (3) Utility
Workers |
hand tools,
materials, truck, equipment |
24 hr |
event |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| LOCATES |
Meet
contractor/locate |
$8.03 |
1 |
$8.03 |
10 |
$80.30 |
Maintenance
Tech |
truck, tools |
30 min |
site |
| |
|
|
|
|
| TOTAL |
|
|
|
$11,819.36 |
|
$80,596.66 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|